I applied online. The process took 2 weeks. I interviewed at Itron (Oconee, GA) in Jan 2010
Interview
They initially told me that the location was Raleigh but later as Oconee, SC. Interviewed with Manufacturing and R&D professionals. Had 2 telephone interviews before making it to the onsite for another 6 rounds of 30-45 mins each. Was quite technical especially that done by the R&D team.
Work culture is quite laid back relatively. Quite friendly people with a lot of old people working here all their life!
Interview questions [3]
Question 1
Interviewer drew a circuit diagram with passive components and asked me to draw the VI characteristics and explain, transmission line characteristics
I applied online. The process took 1 week. I interviewed at Itron (Waseca, MN) in Aug 2018
Interview
2 Telephonic interviews first one is with HR and the second one is with Hiring Manager. Then 5 rounds of on-site interviews 1 with HR, 2 Technical interviews one of them will be hiring manager, 2 interviews with the operational managers.
Interview questions [1]
Question 1
The HR Interview is generalized question list it is better to prepare these before the interview from a list of HR interview questions available on internet. The 2 technical interviews are based on your resume mostly and technical details and questions based on the projects from the resume. 2 interviews with operational managers is to check the cultural fit with Itron and some generalized questions.
I applied through university. The process took 1 week. I interviewed at Itron (West Union, SC) in Nov 2017
Interview
One general phone interview (30 minutes), one technical phone interview (45 minutes), and one on-site interview with tour of the location (3 hours). The on-site was very much a "getting to know you" experience; not many technical questions.
Interview questions [1]
Question 1
What do you feel like you could have improved in a recent project?