I applied online. The process took 3 weeks. I interviewed at Conexant Systems (Newport Beach, CA) in Dec 2009
Interview
Two on-site half-dat interviews including interview with HR and technical people (Engineers, Managers, VP). Called for The second interview about 1 week after the first. Offer made about 1 week after second interview.
Interview questions [1]
Question 1
How to take account of power distribution during design and layout of Integrated Circuit ? What is the offset voltage, gain, PSRR, CMRR, bandwidth of opamp ?