Pros
Location (merritt island Florida) and 401k retirement package.
Cons
Bad management issues. HR does nothing for the hourly employees. If you are on the shop floor you are less than dirt! Quality issues in the mating of the prefabed galley and head section to the floor joists. They leave massive voids in the adhesive or (gunk) that they simply cover up at the visible spots only. This usually happens in phase one in the assembly area. During deck to hull mating the phase one guys do not measure how much to cut off the bulkheads. Instead they cut off a foot or more then after the deck is set hold the peices back up then trim them and STAPLE them back in. After that they simpley fiberglass over them and cover it with vinyl. I could go on and on!!!