BAB-485..Energy Division..Hopeless Management, Only expats and boot-lickers/pretenders rips all the fruits of progress - Engineer Archirodon Employee Review

1.0
9 Apr 2022
Recommend
CEO approval
Business outlook

Pros

Salary and Benefits. No Standard Holiday system, each person can choose day & span of their weekends.

Cons

If you want to gamble with your career, this is the company to be in. Top Management behaves still like a pure sub-contractor, gives no respect to specifications/standards nor having any quality in the works executed in site. From Engineering, all standard practices/steps are skipped for the sake of progress due to immense pressure from management who has zero experience in this field, creating ten-hold consequences in proceeding activities . Company does not provide necessary importance to various departments, and consider all other departments to be joke apart from construction. Increments and updation of ones salary's are not determined by your own hard-work , but whom you know in the top management and whether you are their lap-dogs. And for the management their vision is so narrow minded, they think that only the people who take center stage during the climax of the show ,are the real-deal and deserve promotions. Good company for the fakers and actors/actresses/pretenders.

Explore other reviews about Archirodon

4.0
4 Apr 2021
Recommend
CEO approval
Business outlook

Pros

Good salary comparing to the market High level of stability

Cons

No KPIs Promotion based on number of spent years not on progress achieved

1
5.0
7 Apr 2026
Recommend
CEO approval
Business outlook

Pros

• Mechanical Engineer having 36 Years of Experience in fields of Executing to Tender. Bidding, Engineering, Procurement, Construction,Workover Engineering, hook up, hydro test. Commission of Cross country (Oil & Gas) pipelines, Flow lines, Refinery & Petrochemicals Expansion, Chemical process Plant, Rig Plot, Xmas-Tree. well head, Water well injection, Oil tanking terminal facility, MEP Project, Captive and Cogeneration power Plant. Processing and hydrocarbon handling facilities with exposure to long-distance pipeline and booster station systems. • International Projects of Oil &Gas processing, Water & Waste water Treatment, ITR control , Blast rates &specialized Building, Jacksers,top side, Anchor piles ,offshore Bridges, Skids,. package, modular solution, Automation control (PLC,SCADA,DCS), Remote control stations,SIS (F&G,ESD,SIS,HIPPS). • Budgeting, cost control, & variance analysis, Drive cost optimization & efficiency Variations,changeorders&claimsmanagement.QSPipelineprojects(MRICS/AIQS)Risk,Stakeholder,CommunicationManagementPlan,Review, monitor project baseline schedules, claims, variations • Pumps, Valves. Air compressor, HVAC works includs ducting, chilled water piping, and equipment installation. plumbing, drainage, water supply system installations..BIM, FM200System, NFPA14Fire Hydrant System • API 620 tank, API 650 Editions 12, 2013 , Cone Roof Tank, 60Meter,Dome Roof Tank, Internal Floating Roof, Floating roof tank,ASME SEC. 8, DIV1 ,Carbon Steel Storage Tank for JET A1 Fuel Storage. Crude oil, Gasoline , components

Cons

No Concern • Project Planning, Scheduling, Cost control, Man-hour control, Resource cost and utilization • Risk Analysis & Mitigation Plan, Root Cause analysis, identify and Execute the Corrective Action • Managing MRs, vendor offer reviews, TQs/ TBE, PO award, spares management • Ensure quality checks and Progress tracking of design activities performed in the 3D environment

See reviews by: Helpful|Rating|Date|All