Glassdoor users rated their interview experience at polin waterparks as 100% positive with a difficulty rating score of 3 out of 5 (where 5 is the highest level of difficulty). Candidates interviewing for Project Engineer and rated their interviews as the hardest, whereas interviews for Project Engineer and roles were rated as the easiest.
The hiring process at polin waterparks takes an average of 90 days when considering 1 user submitted interviews across all job titles. Candidates applying for Project Engineer had the quickest hiring process (on average 90 days), whereas Project Engineer roles had the slowest hiring process (on average 90 days).
I applied online. The process took 3 months. I interviewed at polin waterparks (Istanbul)
Interview
Very positive, friendly attitude during the interview. First, I met the HR and went through a English-Turkish interview. On the same day, they wanted me to meet the Manager who was also very positive.